Live Track - Past 90 daysDistance Sailed to date - 15,383Nm
Download Email Maximum of 160 characters and you cannot include images, as this is a Short Message Service only. Download
Download our track Email us OffShore SMS us OffShore Download GoEast tracks

Monday, April 29, 2013

Anzac Day - Becher Point

Anzac Day and a quite motor up to Becher Point. We had the intention of sailing on to Rottnest, however, with "Zofia" nicely anchored in 3 metres of water with 20 metres of chain out why not just stay! Made Eva a Gin and Tonic, opened a beer and just enjoyed the surroundings. A little boat maintenance, ding identification, sleeping and reading, is that not what cruising is about? Tried out the new 4G modem and internet connection and it all worked just fine. Had a little problem with the fridge controller which appears to be due to a voltage drop across my newly installed relay, however, managed it OK and we will fix it over the coming week. All in all a nice motor back, so no sailing but a good run for the engine with all working well.