Live Track - Past 90 daysDistance Sailed to date - 15,383Nm
Download Email Maximum of 160 characters and you cannot include images, as this is a Short Message Service only. Download
Download our track Email us OffShore SMS us OffShore Download GoEast tracks

Friday, December 28, 2018

Fuel Filter Duplication Project

By the time all the Christmas mayhem was behind us The Bloke was twitching for the arrival of a package containing his duel filter kit. Despite being at the end of any Australian transport routes, it arrived in Hobart promptly. 

The package arrived with filters, taps and hose clips.
A bit of shopping for screws, bolts and hoses and The Bloke was good to go.

It pays to chat about proposed boat projects because it turned out that Chris from Bilbungara had embarked on the very same one. In fact, he was somewhat further progressed. While we were at it,  why not move the entire assembly to the engine bay so the filters could be more easily accessed for checking and servicing, was his suggestion? The existing set-up had the filter beneath our bunk. To get to it all, the bedding needed to be removed and the bunk disassembled and even then it was in a fiddly spot to work on. Accessing fuel filters is hardly something you want to be attempting in a heaving sea and bad enough at routine services when tied up against something hard and stabilizing. This presented a good opportunity to improve access. 


The Bloke scavenged some marine ply from the hard-stand work area bins, cut out a mounting board with slots to accommodate the tap levers then painted it silver. Painting was intended not just to look good but to prevent it absorbing any diesel spills which would smell awful. The engine bay is separated from our cabin only by a panel.


Filters attached to the mounting board
Reverse side of the mounting board where the lever operated taps are fitted
Mounting in profile. 
Long bolts in hose cutt-offs acting as spacers to hold the mounting off the engine bay wall.
  
Of course it took a little longer than planned but there is really no such thing as quick job on a yacht. The process was estimated to take a couple of days. A week later and after the typical time blow-out obtaining extra parts and fittings it was all in place and ready for testing.
  
  
 Side profile (L) and Top view (R)of assembly within the engine bay.
Close-up of slot to operate the tap-levers.

The engineering for this job was as complicated as The Bloke had ever experienced because the entire arrangement had to fit into a particular and tight space. The tolerances were within 5 -10 mm.  The assembly had to miss an engine mount plus the panel enclosing the engine bay still need to close. Once installed it all came together, which only goes to prove luck will win out over talent every time. 

POST SCRIPT : The accelerator cable needed to be restrained with a cable tie to avoid vibration chafe. The most recent engine service proved the efficacy of the relocated filters. Winning.


Monday, December 17, 2018

Bryans Corner to Triabunna - Just Ahead of Christmas

The bunch sprint that constituted the fleet of boats that left Eden for Bryan's Corner /Passage Beach, were assembled for a couple of days getting over the 52hours passage. There is as much nervous energy as physical energy involved. Nobody claims the jump from Eden to Tasmania as one of their favourite crossings. Most of the boats moved on within 2 days. We instead, decided to linger an extra night and relocated from Passage Beach to Byan's Corner. It holds fond memories for us and visually we enjoy it too.

View looking back to the gap that is Schouten Passage.

  
Low cloud/fog drifting down the hills created an interesting atmosphere.

Rather than make an immediate run for Hobart, we chose to call into Triabunna, a town we'd not previously visited. David Read, who we'd met in 2014/15 is now a resident there so we thought - "Why not call in?". David is now the Vice-Commodore of the Spring Bay Boat Club and was able to squeeze us in on one of the club jetties. The public marina, was otherwise 'chockers' and unable to accommodate us. How lucky to be in-the-know.

Zofia perched on the end of the dock

Gail and George from Southern Belle made the Bass Strait crossing a few days ahead of us and were ensconced in the marina and had watched our progress across 'the ditch' with baited breath. While the other boats scattered to Maria Island or taking the Easterly route around the Tasman Peninsula to later rendezvous in Hobart, we took a breather and sheltered from a 'significant blow' in the cute township of Triabunna.

Recommendations to visit the pub could not be followed through due to renovations

Gail and George (Southern Belle), made great companions as usual.

The Fish Van is something of a legend and The bloke needs little encouragement.

  
David took us for a drive to a nearby high-point where we could capture the view across Spring Bay and Mercury Passage. 

Being unable to make the hop to Hobart by 18th of December meant were not going to be in Hobart to great Lucas, Amy and the grandchildren on their arrival. We were however accessible from the land and we were only 40 minutes from their planned Day-1 touring destination. A detour to the Fish Van was hardly a problem. We'd definitely make it to Hobart to host them onboard and spend Christmas together.

Thursday, December 13, 2018

The Diesel Must Flow

For eleven years we have never had a fuel problem. It appears all good thing must come to an end. Two and a half days of shake, rattle and roll across Bass Strait will stir up accumulated "crud" in the fuel tank. The water separating filter tried it best to cope but it finally gave up. Unable to pass fuel, the engine was soon starved of that vital liquid, spluttered and stopped. At least it was daylight albeit blowing 30 knots in 3m breaking seas just off  Wineglass Bay. Not to worry, we are a yacht after all. So we deployed more sail, hand steered because the auto-pilot could not cope and then sailed through a narrow passage onto anchor.

Magnificent and rugged rock walls near Schouten Passage with signature
Tassie orange algal highlights.
 
It sounds so straightforward, however, as soon as we turned into the opening in the cliffs that forms Schouten Passage, the wind was blocked. The sails hung a little limp. Gulp. Fortunately, both the swell and the tide was in our favour and with the help of an occasional slight puff of wind, we were eventually sucked through the pass by the tide at barely 2 knots, providing plenty of time to examine the rock faces which were unnervingly close. There is never a dull moment.

100% focus. The end of 52 hour passage soooo close!

Now to sail onto anchor; something we'd never done before. We pulled out our small inner headie to make the anchor locker accessible and free of flapping sails and everything simpler to handle. The inner headie requires only 30 or so turns on the winch to furl it up, versus 76 for the big headie, meaning it's far more manageable. Fellow cruisers who'd already anchored ahead of us couldn't work out what we doing. Having sailed through Schouten Passage, why were we now sailing up and down the beach. Showing off perhaps. A victory lap? A further problem had emerged. The anchor winch requires the motor to be running. We faced the prospect of manually deploying the anchor and despite the anchor winch having been serviced only 10 weeks before, it was jammed. We wanted this passage to come to an end, be still, have an 'anchor dram' or two and go to sleep. No more challenges PLEASE!
The rocks were quite close. A bag of jelly snakes on hand to help with the stress and excitement.

Tacking away from the beach, The Bloke had the F@#k Box on stand-by while he searched the Mechanical Toolbox for the rubber mallet with the hope of 'persuading' the gypsy to release. No joy. What to do? Perhaps we could try just engaging the starter motor battery by turning the ignition key to the 'on' position to open the electric circuit to the hand-held winch controller? Right now we needed to cash in on some extra luck. Joy of joys, it turns out that the anchor winch will operate without the motor actually running. Blessed be Jeanneau!  The anchor winch drags a huge current which is why it's on the same circuit as the motor. No doubt the batteries would otherwise be spent in a heartbeat. It makes sense for the anchor winch to operate at the same time as the motor which is creating current.  We were dropping rather than attempting to retrieve the anchor; gravity and momentum from the combined weight of the anchor and chain would do the work so long as the circuits were open. This was a happy discovery. Phew!

No time to waste. 

Now to fix the problems. Anchor drams were on hold. At least we were not bouncing about in the ocean and were finally still. Sorting out the jammed gypsy on the anchor winch was fairly easy. Plenty of WD-40 and The Bloke's enthusiastic banging with the rubber mallet did the trick. Now for the bigger task - dismantling our bunk to access the primary fuel filter; replacing it and testing if the motor would run. With luck, this would be the source of the problem and not something more sinister.

Blocked and cruddy filter. Job done saving the engine.

Despite having just completed a 52 hour journey The Bloke got on with the task immediately. The replacement was successful, the motor started up straight away, meaning that the problem was identified and rectified. Then came the inevitable debriefing and discussion on what we could have done to prevent this unfortunate occurrence.

The anchor dram was the sweetest of any we can recall. By now it was 13th December although not a Friday. Perhaps this is why there was a happy ending.

Investigations and discussions with other cruisers soon revealed that a duel filter system is used by many cruising yachts. All you need do is duplicate the water separation filter, connect the two filters with valves to enable them to be isolated and replace the input and output fuel lines. What could go wrong? Well a lot really but it had to be done. The Bloke ordered parts on-line from our anchorage so that the project to be commenced as soon after our arrival in Hobart as possible. Christmas would create a non-negotiable delay but at least all the parts would be to hand. We were resolved - this is never to happen again. The diesel must flow!

Sunday, December 2, 2018

Jervis Bay Stopover

Another of those second-time-lucky trips. Weather forecasting was triple checked after our last effort: Three PredictWind models, Windty, the BOM (Bureau of Meteorology) all concurred there would be light winds early that would increase to a nice NE breeze by mid-morning. Good-oh.

We departed the Cronulla Marina after lunch, waiving goodbye to our friends on Onora who had the inconvenience of a refrigeration issue. Being a significantly larger vessel, they’d catch us up as soon as they could further down the track. Just to reinstate equilibrium, we only motored up to the end of Gunnamatta Bay and took up our station on the courtesy mooring again. We quite like the chance to clear off from a busy jetty-visit and sit quietly somewhere overnight to 'set our heads' for the next trip. 


Evening settling in at over Gunnamatta Bay

Once off again in the morning, we committed to motor-sailing which lasted for 5 hours until the wind arrived. It was a little longer than we'd expected from the predictions but by now we we'd consigned the forecasters to the 'lying-bastards.com' bin anyway. A head-start was needed to get to our destination before dark. What a contrast to our last aborted trip! By the time we were abeam of Port Kembla/Woollongong, the wind although light, was filling the sails enough to sail. Engine off. Hooray. We enjoyed the afternoon's sailing until the arrival of the second swell which occasionally had the boat almost stopping. Since neither wind nor swell was coming from the South we were at least able to take a shortcut just north of Point Perpendicular and pass through the Sir John banks which would otherwise cause breaking seas and a detour to seaward. Not withstanding, the Bloke needed to hand steer to hold a course.

 Point Perpendicular, the imposing northern headland at the entrance to Jervis Bay.

Having visited Jervis Bay on our way north 3 1/2 years ago, we had a mental image of how it looked and where to find the public moorings at The Hole In The Wall anchorage. You can anchor there but it's in a National Park and anchoring inside of 10m of water depth is prohibited in order to preserve the sea grass. Since the weather was once again predicted to get wild, being well tucked in was preferable. Fortunately, the National Park courtesy moorings had recently been serviced. Even though it's an anchorage for Southerly or Easterly winds, predicted northerlies would last only 1/2 a day and to get the appropriate shelter would require sailing 6nm across to the other side of the bay. We couldn't be bothered with the to-ing and fro-ing. We decided we could hang on the mooring even if it would be a lee shore and a little uncomfortable.

Sea grass below the boat looking like a shag pile carpet

As so often happens, the wind died off completely overnight, allowing 20/20 vision through the water. By morning Hurtle Turtle (another cruising catamaran we know) had arrived after an overnighter from Sydney and ahead of the change. Their destination was also Hobart and meant we'd have company later during our southward passage as well as when the barometer dipped announcing the arrival of yet more strong wind, albeit for just half a day. 

Hurtle Turtle riding it out along side.

At 995hPa, strong wind is never far away.

 
An artist's impression of the Hole In The Wall anchorage in the early 1800's. 
The headland in now somewhat collapsed leaving a 'U' shape gap. The Bay is also considerably wider